Compressed Natural Gas Fueling System

Lyles Mechanical Co.
Madera, California

Compressed Natural Gas Fueling System
Contract Amount: $1,230,000
Completion Date: May, 2012

This project was a turn-key installation of a Compressed Natural Gas (CNG) fueling facility for the joint ownership of the City of Madera and Madera Unified School District with financial assistance provided by the Federal, Congestion Mitigation Air Quality Act. The installation included a 150HP compressor enclosure, a twin tower regenerating gas dryer, a priority valve panel, a dispenser and associated interconnected SS tubing and electrical services. Lyles Mechanical Co. self-performed all of the civil, concrete and mechanical work for the project which included a portion of underground gas pipeline and installation and testing of the 5,000 PSIG stainless steel tubing for the high pressure side of the system. In addition to the self-performed work, Lyles Mechanical Co. served as the prime contractor on the project and managed several subcontractors in the execution of the work.

Owner:
City of Madera
205 West 4th Street
Madera, CA 93637

Owner Contact:
Jerry Martinez
(559) 661-5424

LMC PM:
Ian Leisle
(559) 237-2200

Design Engineer:
AECOM
5001 E. Commercenter Drive, Suite 100
Bakersfield, CA 93309

Engineer Contact:
Bill Black, P.E.
(661) 325-7253