Pacific Ethanol Plant

Lyles Mechanical Co.
Madera, California

Pacific Ethanol Plant Madera
Contract Amount: $68,716,000
Completion Date: July, 2006

AGC of California Constructor Award for Excellence in Project Management; Design Build Institute of America Best Project Award; California Construction Best of 2007 Award of Merit for Industrial/Manufacturing – Extensive Design – Build Ethanol Production Plant with a 40 MGY capacity. First major plant for the state of California with complete design and construction responsibility. Complete plant construction including site utilities, structural concrete, tanks and equipment, infrastructure, and complete fabrication shop on site to produce and coordinate all pipe operations.

Owner:
Pacific Ethanol, Inc.
400 Capitol Mall, Suite 2060
Sacramento, CA 95814

Owner Contact:
Paul Koehler
(916) 403-2123

LMC PM:
Paul Lukianov/Matt Teixeira
(559) 237-2200

Design Engineer:
Delta-T Corporation
323 Alexander Lee Parkway
Williamsburg, VA 23185

Engineer Contact:
(757) 220-2955