T-3 Water Storage and Treatment Facility

W. M. Lyles Co.
Fresno, California

T-3 Water Storage and Treatment Facility
Contract Amount: $ 13,885,800
Completion Date: December, 2012

This project involved the construction of a new 8 MGD packaged surface water treatment facility. The work included a new 3 MG pre-stressed concrete water storage reservoir, Trident filtration system, raw water pump station, transfer pump station, high service pump station, chemical feed system, washwater equalization basin, washwater reclaim and raw water backflow pump stations, inclined plate settler, granular activated carbon vessel system, carbon dioxide storage and feed system, sludge disposal system, emergency back-up power generator, electrical and instrumentation with SCADA integration, site grading, landscaping, paving,
yard piping, and an operations building.

Owner:
City of Fresno – Water Division
1910 E University Avenue
Fresno, CA 93703
Lennar Fresno, Inc.
8080 N Palm Avenue, Suite 110
Fresno, CA 93711

Owner Contact:
Glenn A. Knapp, P.E. – City of Fresno
(559) 621-5321
Les Peterson – Lennar, Inc.
(559) 437-4269

W.M. Lyles Co. PM:
Ruben Moreno

Design Engineer:
AECOM
1360 E Spruce Avenue, Suite 101
Fresno, CA 93720

Engineer Contact:
Kevin Berryhill, P.E.
(559) 448-8222, Ext. 106

WML_Lennar_3 WML_Lennar_2